Home
Events
Contact Us
FTP  Site Link
Services
Construction Stakeout
Foundation Layout
Anchor Bolt Installation
Setting Leveling Nuts
Anchor Bolt Surveys
MGM Grand Detroit Casino
Comerica Park
National Alabama Railcar Facility
Chrysler Technical Center
Chrsysler Jefferson North Assembly
Precast Layout
Column Plumb Surveys
Crane Rail Alignment Survey
Final As built Surveys
Steel Detailing
Skylight Measurements
   
 


Owner: National Alabama Corporation                                                                                                   Location: Cherokee, Alabama                                                                                                                 Market: General Manufacturing                                                                                                              Service: As Built Anchor Bolt and Crane Rail Surveys                                                                         Certified Project Size: 2,200,000 sq.                                                                                                     This plant is the single largest railcar manufacturing facility in North America and the largest industrial facility to be registered under the LEED Green Building Rating System.


Field Measurements Inc. Provided As Built Anchor Bolts Surveys for the entire plant.

Field Measurements Inc. provided surveys for both the overhead and gantry crane rails for the entire facility